PKI Hub supports a disaster recovery model in which two PKI Hub clusters are deployed in an active/passive warm standby model across two independent datacenters. Each datacenter hosts an identical cluster. One datacenter operates in active mode and receives production traffic through the load balancer. The second cluster is maintained in warm standby, with all software installed and configuration pre-applied, but with application services stopped.
This approach minimizes recovery time while ensuring configuration consistency and operational readiness.

See below for details on each component.